◉ANTIGRAVITY LABJP
TAG

credits

4 articles
← Back to all tags
Related:
quota1Antigravity CLI1indie dev1antigravity-cli1workflow1Antigravity1Pricing1antigravity1cost-optimization1pricing1productivity1tips1
◉ Antigravity/2026-09-17Intermediate

Wait or Pay When the Baseline Runs Out: Deciding Credit Overages Per Task

When your baseline quota is exhausted, one setting decides whether you wait for the refresh or spend purchased credits. Here is how I split attended work from unattended runs, and the small gate I put in front of the jobs nobody is watching.

✦ Tips/2026-08-31Beginner

One Argument Now Switches Your Model in Antigravity CLI — and Rewrites Your Default Too

In CLI v1.1.22, /model takes an argument, switches instantly, and saves that model as your default in the same stroke. Here is the forget-to-switch-back trap that comes with it, and the start-of-session habit that fixed it for me.

◉ Antigravity/2026-05-03Beginner

Antigravity's New $25 / 2500 Credit Pricing — Full Breakdown of Credit Consumption and Optimization

An empirically-measured breakdown of Antigravity's $25/2500 credit plan: which actions consume how many credits, where the waste is, and how to stay within budget while building real things.

✦ Tips/2026-03-22Advanced

Antigravity AI Credit Optimization — Practical Strategies to Maximize Output While Minimizing Costs

A deep analysis of Antigravity's new AI credit system. From understanding credit consumption patterns to cost optimization strategies, this guide helps you get maximum output on any budget.